Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Rated Capacity
Rated Voltage
Country
Message
0/1000

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Rated Capacity
Rated Voltage
Country
Message
0/1000

Design, supply and installation of the 110KV substation project

 

Client: Mongolian Power Transmission Company

image12.jpg

【Project Overview 】

 

The climate in Mongolia is extremely harsh, and the extreme cold in winter poses a significant challenge to outdoor power equipment. For this 110KV substation project, we provided an anti-chilling design. All primary equipment was selected in models suitable for -40°C low-temperature environments, and the secondary protection equipment compartment was equipped with reinforced insulation and heating systems.

 

At the same time, we extensively used prefabricated modules, such as prefabricated secondary equipment rooms and prefabricated foundations, which minimized the on-site work volume and time during adverse weather conditions, ensuring the project was completed on schedule. This substation has become one of the most reliable stations in Mongolia's power grid, effectively supporting the local mining energy development and urban and rural electricity demands.

Customer Testimonials

After replacing the energy-saving transformer, the factory's average monthly electricity consumption has dropped by about 15%. The no-load loss and load loss are significantly lower than the national standard. The electricity bill saved by long-term use is close to the equipment purchase cost, and the cost-effectiveness is outstanding.

Jack Richardson

Jack Richardson

Time: 2022.06.24

The quality of the transformers is excellent, and the technical support team is very professional. They helped us customize the solution according to our specific requirements and provided excellent after-sales service.

Sarah Wilson

Sarah Wilson

Time: 2022.07.15

Outstanding product reliability and performance. We have been using their transformers for over 3 years without any issues. The energy efficiency has significantly reduced our operational costs.

Michael Chen

Michael Chen

Time: 2022.08.20